Akim of Almaty Bakytzhan Sagintayev checked the pace of construction of social and engineering facilities in Alatau district

Akim of Almaty Bakytzhan Sagintayev checked the pace of construction of social and engineering facilities in Alatau district

“Akim of Almaty Bakytzhan Sagintayev, during a working detour, got acquainted with the construction of kindergartens, schools, water supply networks, roads and landscaping. In order to increase the number of school places in the district, it is planned to build 5 new schools and two buildings for existing schools,” the press-service of the akim of Almaty reports.

Akim of the city examined the new building of the lyceum №166 for 125 places. The new building, which includes a library, a canteen and a gymnasium, has improved the learning environment. An outdoor sports ground has also been built. In general, 24 new gaming and sports zones will be created in the Alatau region under the Participation Budget project. Local public spaces in previously abandoned areas will also be improved. In md. Daraboz opened a new private kindergarten Zere School, designed for 320 places. After familiarizing himself with the educational program and the internal structure, the city akim instructed the head of the education department to work out the issue of compensation for payment for children from low-income families. B. Sagintayev also visited the construction site of the future national scientific center of infectious diseases. The new medical institution, built on behalf of Elbasy, will have 350 beds. At this stage, preparatory earthworks are being carried out. About 110 thousand cubic meters were taken out for the foundation. m of soil. To improve the sports infrastructure in the area, a fitness center and a tennis center with four indoor and ten outdoor courts are being built. B. Sagintayev instructed to accelerate the pace of commissioning facilities. Akim of the city examined the table tennis center under construction by a private investor. The area of ​​the gaming hall, designed for 12 tables, is 1510 sq. m. There is a hotel and a dining room for athletes, stands for spectators. In md. Zerdeli B. Sagintayev checked the progress of strengthening the foundations of the houses.

To date, in accordance with the survey carried out and the recommendations of KazNIISA JSC, three houses have been strengthened and leveled. This year it is planned to strengthen the foundations of 10 houses. Painting of facades and repair of entrances of fortified houses is underway. In addition, it is planned to improve the courtyards with the repair of irrigation ditches. Construction and installation work is being carried out in accordance with the work schedule. Akim of the city instructed to conduct daily quality control and progress of construction work. Akim of the megalopolis got acquainted with the course of repair of facades of 18 houses in the microdistrict Nurkent. B. Sagintayev instructed to involve specialists of the urban planning control department and, together with active residents of the microdistrict, establish strict control over the quality of the work carried out. It is also necessary to take into account their opinions regarding the improvement of the courtyard area and the organization of an additional exit from the residential complex. In md. Algabas city akim was informed about the pace of construction of engineering networks. As part of the first phase of the project, 14.5 km of water supply networks and 11 km of water disposal were built last year. This year it is planned to build 2.5 km of water supply and 2.5 km of sewerage networks. Connection of subscriber water supply networks is underway, as well as preparation of the foundation for the roadway. 6 thousand residents (1250 houses) will be provided with water supply and sewerage services. As part of the second stage in the microdistrict. Algabas is planned to lay 10 km of water supply and sewerage networks. Completion is scheduled for next year. 1,014 houses, where 4.5 thousand people live, will be connected to the networks.

Akim of Almaty B. Sagintayev also appreciated the quality of work to eliminate flooding on the street. Aldiyar md. Algabas and got acquainted with the progress of work in the microdistrict. Aigerim-1, 2. Construction of 15 km of water supply networks and 15 km of water disposal is underway. The work is scheduled to be completed next year. In order to ensure public safety in md. Nurkent opened a new police department at the district administration. Akim of the city was informed that 90 employees work here, the service area is 2 thousand hectares, the population is about 97 thousand people. Premises with an area of ​​400 sq. m allocated on behalf of B. Sagintayev. During the working detour, the city akim also got acquainted with the projects for the improvement of public spaces within the framework of the “Participation budget”. So, on Raiymbek Avenue – st. Momyshuly, the reconstruction of the bridge space is underway with the creation of playgrounds and sports grounds. In md. Aigerim is improving the local public area, and at the intersection of st. Monke bi and Almerek the area around the artesian spring is being cleaned up.