Over 100 thousand road signs installed on the roads of Kazakhstan
The work on the implementation of the two-month period on the arrangement and elimination of defects of the road surface on the republican roads was completed. During this time, the road workers completed 60% of the annual plan.
In particular, in two months, 7969 units of road signs were installed and replaced. This is 62% of the annual plan. It is planned to install another 4922 characters. In addition, during this time, the road service installed 2204 kilometer signs or 86% of the annual volume of planned work. In addition, by the end of the year, 354 signs will be placed on the country’s roads. It was also installed and replaced by 49% of road panels, all by the end of the year, road workers should install 509 units.
It should be noted that throughout the entire network of national roads there are 106 thousand road signs. Of these, 39,200 units are prohibiting, 28,600 are warning, 14,800 are informational, 7,500 are prescriptive, 11,600 are priority signs and 4,300 are service signs.
At the same time, as part of the two-month period for the arrangement and elimination of defects in the road surface, patching was performed on 277843 square meters of the road surface and 16,932 kilometers of roads were marked.
Recall, in order to ensure road safety in Kazakhstan, the “Integrated Target Program” is annually implemented, which includes patching, installation, and replacement of road signs, installation, and repair of fences, marking of the roadway.